<heading-style-h2>POTEAU TERRE<heading-style-h2>
<heading-style-h6>Allows anchors to be fixed in natural and/or sandy ground.<heading-style-h6>
<heading-style-h3>Installation procedure<heading-style-h3>
1. - Drill the ground with an auger bit of at least 80 cm x 35 mm.
- Check that there are no stones or obstacles.
- If an obstacle is found, move the post location slightly.
2. - Place the posts with the upper gussets perpendicular to the direction of the load.
- On sloping ground, orient the gussets perpendicular to the slope.
3. - Drive the posts in with a sledgehammer and a dedicated driving cap so as not to damage the fixing head.
- The posts must be driven in up to half of the “HOOKT” logo engraved on the side.
4. - Once the posts are installed, mount the New Pro interfaces and fit the lifeline cables.
- Make sure the tension is correct and the anchor points are aligned.
5. - Check that the posts hold firmly and show no abnormal deformation.
- Make sure the system is installed with redundancy (at least two posts).
- To date, the posts are not certified as individual anchor points, only for mounting the New Pro lifeline.
If the lifeline consists of two posts, perform a 5 kN pull test on each anchor.
If the lifeline consists of three or more posts, perform a 5 kN pull test on the whole line.
Warning: ground posts are designed to deform from 6 kN. If deformed, the post can no longer be used and must be replaced.